GE PT878GC 用户手册

下载
页码 308
April 2004
3-16
Installing the First Bracket with a Chain or Strap
The following steps describe how to install the PI fixture with a 
supplied chain or strap.
1. Carefully wrap the chain or strap around the pipe, taking care 
not to twist it.
2. Loosen the wing nuts up to the end of the J-hooks. Then hook 
the chain into the tightest links and loosely hand tighten the 
wing nuts. If you are using a strap, insert the J-hook into the 
smaller round hole on the strap.
3. Line up one edge of the CFG-PI holder bracket with the origin 
scribe line and fully tighten the chain or strap (see Figures 
3-17 and 3-18 below).
Figure 3-17:  Lining up the First Bracket
4. Install the transducer dummy block to verify the 
circumferential and axial location. Center the indicator line on 
the block to line up with the scribed mark (see Figure 3-18 
below).
Figure 3-18:  Positioning the CFG-PI Holder Bracket
5. Loosen the transducer hold-down screw and tighten the J-
hooks on the clamping fixture. Be sure the bracket has not 
moved from its position.
Front  Edge of
Holder Bracket
Origin Scribe Line