Outback Power Systems GFX1448E 用户手册

下载
页码 40
Installation
 
20
 
900-0111-01-00 Rev A 
Mounting Surface
M8 x 1.25 Stud 
Lock Washer
Battery 
Cable Lug 
13 mm Nut
Flat Washer
Insulator
 
 
 
 
 
 
Figure 9 
Required Order of Battery Cable Hardware 
 
CAUTION:  Fire Hazard 
Never install extra washers or hardware between the mounting surface and the 
battery cable lug.  The decreased surface area can build up heat.  
 
 
 
Install battery cable lug, nuts and washers in the 
order illustrated.   The battery cable lug should be 
the first item installed on the stud.  It should make 
solid contact with the mounting surface.  Do not 
install hardware in a different order than shown.