Royal Sovereign thinflex rsh-380 用户手册

下载
页码 7
RSH-380
6
6.  FILM LOADING & THREADING
< Film Threading >
1. Turn the power switch on (“I” position).  (The Power 
switch is located on the rear the unit)
2. Complete the steps in the  "Loading Film" section.
3. Set the desired temperature.
4. Remove the Front Feed Table.
5. Pull down the upper film over the Safety Shield to the 
lower film; align and center the lower film to the 
upper film and tighten the 2 lower bolt core 
screws. (Figure 1)
6. Rewind the upper film until it aligns with the safety cover.
7. Thread the film over the Lower Idle Bar and underneath 
the safety shield until the film rests on the upper 
roller. Figure 2
8. Put the Front Feed Table back on and close the Safety 
Shield.  Figure 3
9. Press the Run button and thread the film using the 
Laminating Threading Card.  Figure 4
< Thermal Film Loading & Threading >
Loading Film
1. Remove the upper and lower film shafts from the        
machine and load the films (do not tighten the 
core screws at this time)
2. To load the top film, insert 1" core as shown on 
Figure 1 (Note the direction of the film wound)
3. Insert the shaft as shown in Figure 2.
Figure 1
Figure 2
Figure 1
Figure 2
Figure 3
Figure 4
Figure 3
Figure 4
Figure 5
4. Insert the core plug on the left hand side.  Figure 3
5. Align and center the film and tighten the two core  
screws. Figure 4
6. Repeat steps 2 through 4 to load the lower film.
(Please note the direction of the 
film wound for the bottom roll).  Figure 5
7. Load the upper and lower film shafts on the machine.
7