Customer-supplied cabinets and racks must have mounting rail and hole spacing compatible with EIA 
Universal  48.3  cm  (19  inches)  specifications.  Cabinets  must  provide  adequate  ventilation  and  must 
meet the following criteria: 
• 
45.0 cm (17.71 inches) deep 
• 
48.3 cm (19 inches) wide 
• 
13.4 cm (5.25 inches) high 
• 
Two mounting rails 5 cm (2 inches) from front cabinet with front mounting holes 5.7 cm (2.25 
inches) apart (center to center). 
The front of the device is provided with four holes for M6 screws. This permits to fasten the device to a 
19” rack by means of 4 M6 screws. 
If  several  devices  are  installed  in  a  single  cabinet,  be sure equipment have to be spaced at least by 
1/2 RU (2,2 cm, 0,8 inches).to allow for adequate cooling. 
Cabinets  must  have  a  least  15  cm  (6  inches)  of  open  space  between  the  air  vents  and  any  wall  or 
other cabinets. This allows adequate air flow. 
When multiple cabinets (each equipped with several repeaters) are installed in an enclosed 
area, ensure appropriate ventilation and consider air conditioning or other climate control 
equipment to satisfy the temperature requirements. 
M6 screws