Mojo Networks Inc. SS300AT 用户手册
Installing
ȱtheȱSensorȱ
SpectraGuard
®
ȱEnterpriseȱInstallationȱGuideȱ
29
1.
InsertȱtheȱtabsȱonȱtheȱtableȱstandȱintoȱtheȱslotsȱonȱtheȱsideȱofȱtheȱSensor,ȱasȱshownȱinȱtheȱillustration.ȱAlignȱtheȱcableȱ
routingȱcutȱoutȱtowardȱtheȱupperȱpartȱofȱtheȱstand.ȱ
routingȱcutȱoutȱtowardȱtheȱupperȱpartȱofȱtheȱstand.ȱ
ȱ
Figure 48.
Inserting tabs on the table stand
2.
ToȱlockȱtheȱstandȱtoȱtheȱSensor,ȱslideȱtheȱstandȱbackȱandȱtheȱSensorȱforward,ȱasȱshownȱhere:ȱ
ȱ
Figure 49.
Locking the Stand to the Sensor
3.
PlaceȱtheȱSensorȱandȱtableȱstandȱonȱtheȱtable.ȱ
ȱ
Figure 50.
Sensor Mount on a Table
4.
ConnectȱtheȱEthernetȱcableȱforȱpowerȱandȱnetworkȱconnectionȱtoȱtheȱLANȱportȱonȱtheȱbackȱofȱtheȱAP.ȱ
5.2.3 PowerȱupȱtheȱSensorȱ
AnȱSSȬ200ȬATȱSensorȱrunsȱonȱaȱ5VȱDCȱconnection.ȱUseȱtheȱpowerȱadapterȱprovidedȱtoȱpowerȱtheȱSensorȱfromȱanȱ110V~240Vȱ
50/60ȱHzȱACȱpowerȱconnection.ȱ
50/60ȱHzȱACȱpowerȱconnection.ȱ
ToȱpowerȱupȱtheȱSensor,ȱperformȱtheȱfollowingȱsteps:ȱ