IDS GeoRadar Srl SRS-FW400 用户手册
IDS Ingegneria Dei Sistemi S.p.A.
Protocol: MN/2009/030 - Rev. 1.2
Safe Rail System Data Acquisition Software
22
/
76
•
SRS_PLUS only: T hen connect the power supply cable to the PC POWER
SUPPLY port on the Control Unit and to the Notebook PC (see Fig. 2-14).
SUPPLY port on the Control Unit and to the Notebook PC (see Fig. 2-14).
Fig. 2-14 – Power supply cable and connection to the Control Unit
2.5
Position radar sensor
As position sensor we provide a Deuta-Werke DRS05 Doppler system (see Fig. 2-15).
The Doppler system must be connected through its cable to the Doppler interface box
(Doppler port). Then you have to connect the wheel cable from the Doppler interface box
(wheel port) to the DAD CONT ROL UNIT wheel port.
The Doppler system must be connected through its cable to the Doppler interface box
(Doppler port). Then you have to connect the wheel cable from the Doppler interface box
(wheel port) to the DAD CONT ROL UNIT wheel port.
Fig. 2-15 – Position sensor
PC Power
Supply
connection
DOPPLER
SY ST EM
CONNECT ION
PORT
WHEEL PORT
POWER PORT
DOPPLER
INT ERFACE
BOX
CONNECT ION
CABLE
DOPPLER PORT