Wavenet Technology Pty Ltd. BM2900D 用户手册

下载
页码 147
Boomer II User Manual & Integrator’s Guide ___________________________________________________ Testing 
BM210012WT37 
77 
Copyright Wavenet Technology © November 2003 
Effective tests provide a systematic, positive acknowledgment from 
each of the network components. For example: 
Test 1  
Is the OEM module able to pass its own self test? 
Test 2  
Is the OEM module able to communicate with peripherals? 
Test 3  
Is the OEM module able to communicate with the integrated 
modem? 
Test 4  
Is the modem able to hear the network? 
Test 5  
Is the modem registered and allowed to operate on the 
network? 
Test 6  
Is the gateway (if present) up and running? 
Test 7  
Is the Enterprise Server Application up and running? 
OEM Service Depot Repair 
When a host/terminal is returned for service, the first requirement is to 
determine whether the modem must be sent on to Wavenet for 
inspection and/or repair. To set up for this test, you need to have an 
evaluation board, a known-good Boomer II OEM modem (for 
comparison), a power supply, Wavenet Commander software and an 
end-to-end test setup. The end-to-end test can employ either a live 
network or an over-the-air test involving a communications monitor 
that can transmit and receive at the appropriate frequencies. The 
objective is to test the suspect modem in a known-good environment, 
in which all other components are known to be operational.  
If the modem has been determined to be faulty it should be returned to 
the place of purchase for inspection and repair.