RadioFrame Networks Inc MCSERIESHP10 用户手册
MC-Series High-Power System
Installation
998--01 Rev X1
RadioFrame Networks, Inc.
CONFIDENTIAL AND PROPRIETARY 43
4.2.1 Equipment Inspection
Inspect the equipment immediately upon receipt. If obvious damage has occurred to the
shipping container before unpacking, contact the shipping agent. Ask that a
representative of the shipping company be present while the equipment is unpacked.
shipping container before unpacking, contact the shipping agent. Ask that a
representative of the shipping company be present while the equipment is unpacked.
Check for the following:
• loose or damaged equipment in the pre-installed cabinet
• dents, scratches or other damage on all sides of each component
• dents, scratches or other damage on all sides of each component
If any equipment is damaged, contact the shipping company immediately, then a Sprint
Nextel representative.
Nextel representative.
4.2.2 Equipment Inventory
Check all MC-Series High-Power system equipment against the itemized packing list to
ensure receipt of all equipment. If available, check the sales order with the packing list to
account for all equipment ordered. Contact the Sprint Nextel representative to report
missing items and for additional information.
ensure receipt of all equipment. If available, check the sales order with the packing list to
account for all equipment ordered. Contact the Sprint Nextel representative to report
missing items and for additional information.
4.3 Mounting the MC-Series High-Power System Cabinet
Refer to the manufacturer’s documentation (included with the MC-Series System
Installation Kit) for installation procedures for mounting and securing the MC-Series High-
Power system cabinet.
Installation Kit) for installation procedures for mounting and securing the MC-Series High-
Power system cabinet.
This section describes procedures for mounting the following non-RFN equipment in the
MC-Series system cabinet (normally the iSC-3s and EAS are shipped installed):
MC-Series system cabinet (normally the iSC-3s and EAS are shipped installed):
• iSC-3 (two)
• EAS
• CSU
• EAS
• CSU
Warning!
Always use two or more persons whenever moving a cabinet. A fully configured
equipment cabinet weighs approximately 800 lbs (360 kg).
equipment cabinet weighs approximately 800 lbs (360 kg).
Warning!
Any equipment installed in the MC-Series system cabinet shall be UL listed.
Warning!
User equipment that is installed shall not draw a combined current of more than
5 Amps. This combined total shall be determined from the marked current rating
label of the equipment to be installed.
5 Amps. This combined total shall be determined from the marked current rating
label of the equipment to be installed.