RadioFrame Networks Inc MCSERIESMP 用户手册

下载
页码 167
MC-Series System Installation & Testing 
Scheduled and Unscheduled Maintenance 
94 
RadioFrame Networks, Inc.
 
7.9.1 RF 
Shelf 
 
Figure 29 
RF Shelf front view 
 
Figure 30 
RF Shelf rear view 
7.9.1.1 
RF Shelf Replacement Procedure 
Power down RFN equipment in the following order using circuit breakers on the PDU: 
• BIC 
• AIC 
•  RBS 1 (power down RBS 2 and RBS 3 if they are present) 
•  RF shelf 1, 2, and 3 
 
Disconnect cabling from the back of the chassis to be replaced. 
DIVERSITY