RadioFrame Networks Inc MCSERIESMP 用户手册
MC-Series System Installation & Testing
Scheduled and Unscheduled Maintenance
94
RadioFrame Networks, Inc.
7.9.1 RF
Shelf
Figure 29
RF Shelf front view
Figure 30
RF Shelf rear view
7.9.1.1
RF Shelf Replacement Procedure
1
Power down RFN equipment in the following order using circuit breakers on the PDU:
• BIC
• AIC
• RBS 1 (power down RBS 2 and RBS 3 if they are present)
• RF shelf 1, 2, and 3
• AIC
• RBS 1 (power down RBS 2 and RBS 3 if they are present)
• RF shelf 1, 2, and 3
2
Disconnect cabling from the back of the chassis to be replaced.
DIVERSITY