Radwin Ltd. AMWL1240 用户手册

下载
页码 98
 
WinLink 1000 System 
2-1 
Chapter 
 
Installation and Setup 
This chapter describes installation and setup procedures for WinLink 
1000 system. 
After installing the unit, refer to 
Chapter 3
 for configuration 
instructions and 
Chapter 4
 for operation instructions. 
In case a problem is encountered, refer to 
Chapter 5
 for test and 
diagnostic instructions. 
 
Internal settings, adjustment, maintenance, and repairs may be 
performed only by a skilled technician who is aware of the hazards 
involved. 
Always observe standard safety precautions during installation, 
operation, and maintenance of this product. 
 
The operator of the spread spectrum intentional radiator or, if the 
equipment is professionally installed, the installer is responsible for 
ensuring that the system is used exclusively for fixed, point-to-point 
operations . The instruction manual furnished with the intentional 
radiator shall contain language in the installation instructions 
informing the operator and the installer of this responsibility. 
 
WinLink 1000 has three types of products: 
• 
Auto channel selection is not supported–Previous or Future release. 
• 
Auto channel selection supported–User can enable/disable auto 
channel configuration. 
• 
DFS–Auto channel is mandatory. 
 
2.1  WinLink 1000 System 
WinLink 1000 system comprises the following units: 
• 
Outdoor Unit (ODU): The ODU has 2 configurations: ODU with 
integrated antenna and ODU with N-Type connector for connection 
Warning 
Note
Warning