Radwin Ltd. WL1000F49 用户手册

下载
页码 97
WinLink 1000 Installation and Operation Manual 
Chapter 2  Installation and Setup 
 
Installation and Setup 
2-7 
Π
To connect the power IDU-E: 
1.  Connect the 2-pin plug of the AC/DC converter to the 2-pin DC 
power connector on the IDU-E rear panel. 
2.  Connect the AC/DC converter 3-prong plug to mains outlet. 
Π
To connect the power for IDU-C: 
• 
For AC power model, connect the AC cable 3-prong plug to mains 
outlet. 
• 
For DC power model, connect to DC supply on the rack (male 
connector for the terminal block is included). 
Installing WinLink 1000 Management Software 
WinLink 1000 management application is distributed on CD-ROM as an 
executable file. The application has the following PC requirements: 
• 
Memory: 128 MB RAM 
• 
Disk: 1 GB free hard disk space 
• 
Processor: Pentium 3 or higher 
• 
Network: 10/100BaseT NIC 
• 
Graphics: Card and Monitor that supports 1024×768 screen 
resolution with 16 bit color 
• 
Operating system: Windows 2000/XP  
• 
Microsoft Explorer 5.01 or later. 
Π
To install the WinLink 1000 management program: 
1.  Insert the CD-ROM into your CD-ROM drive. 
2.  If the installation does not start automatically, run WinLink.exe 
from the CD-ROM drive. 
3.  Follow the on screen instructions of the installation wizard to 
complete setup of the WinLink 1000 Management program in the 
desired location. 
Π
To perform initial setup: 
1.  Power up the site A's IDU (see 
 on page 
2-6
 ). 
Wait about 1 minute. 
2.  Power up the site B IDU.