Radwin Ltd. WL1000F49 用户手册

下载
页码 97
WinLink 1000 Installation and Operation Manual 
Chapter 4  Operation 
4.2  Operating WinLink 1000 
Turning On WinLink 1000 
Π
To turn on WinLink 1000: 
• 
Connect the AC/DC converter to the IDU-E power connector and to 
the mains; or -48VDC from rack or AC 110-240VAC. 
The PWR indicator lights up and remains lit as long as the IDU is 
receiving power. 
WinLink 1000 requires no operator attention once installed, with the 
exception of occasional monitoring of front panel indicators and 
statistics data. Intervention is only required when WinLink 1000 must 
be configured to its operational requirements, or diagnostic tests are 
performed. 
 
Operating WinLink 1000 
4-3