ZTE Corporation ZXMBW-RA25 用户手册
Chapter 6 Main Antenna Feeder System Installation
Confidential and Proprietary Information of ZTE CORPORATION 57
8. Check for any residual copper scraps. The external copper
sheath must be evenly expanded without burrs. Pull the back
part of the feeder connector outward, during which process
the connector must not slip away from the feeder. If these
requirements are not met, make it again.
part of the feeder connector outward, during which process
the connector must not slip away from the feeder. If these
requirements are not met, make it again.
9. Connect the front part and the back part of the feeder
connector, as shown in Figure 41;
F
I G U R E
4 1
F
E E D E R C O N N E C T O R
’
S
F
R O N T
P
A R T A N D
B
A C K
P
A R T
10. 1Screw the front part of the feeder connector in position, and
fix it with an appropriate wrench, so that it does not move
against the feeder. Then screw the back part of the feeder
connector with the wrench till it is fixed, as shown in Figure
42;
against the feeder. Then screw the back part of the feeder
connector with the wrench till it is fixed, as shown in Figure
42;
F
I G U R E
4 2
F
E E D E R C O N N E C T O R
’
S
F
R O N T
P
A R T A N D
B
A C K
P
A R T
F
I X I N G
2 QO\ WXUQ WKLV Z UHQFK
. HHS WKLV Z UHQFK VWLOO
E
ND OF STEPS