Chapter 7 Hardware Installation Check 
 
Confidential and Proprietary Information of ZTE CORPORATION      71 
Cable Installation Check 
The cables of the RA25 include power and grounding cables, 
optical fibers, and RF cables.  
The overall installation requirements are as below: 
Various cables are straight and level, without evident wave 
or deflection. There is no crossover or space jumper.  
Cables must be bent smoothly and evenly and the outer part 
of the bend must be as vertical or horizontal as a direct line.  
Various cables must be attached with labels on both ends, 
which must indicate the purposes of the cables. Labels on 
both ends must have the same contents; 
Every connector must be plugged reliably, correctly and in 
good contact without being broken or bent.  
Cable ties must be in good order, even spacing, and 
appropriate tightness, and face the same directions. Extra 
ties must be cut off down from their roots, without pointed 
ends.  
The connecting terminals  must be equipped with plain 
washers and spring washers. 
Power and Grounding Cables 
Power cables and signal cables must be laid separately, keep 
distance no less than  200 mm  between the two types of 
cable.  
Power and grounding cables must be made of a  complete 
piece of wire, without joints in the middle.  
Each grounding point on the grounding copper busbar must 
be connected with one device only.  
The remaining length of each power/ground cable must cut 
off, but not be coiled.  
The lugs at both ends of the power/ground cables must be 
welded or crimped securely.  
The grounding cables must take the shortest route.  
The bare wires at the connecting terminals and lug handle 
must be tightly wrapped with insulation tape or put in a 
heat-shrink tube instead of being exposed.