Tagsys S.A. LIBPEDESTALAFI 用户手册

下载
页码 62
 
 
Library Security Pedestal 2 
 
 
24/62 
Revision 4.2 
July 2008 
b.  Cement floor: Drill eight holes with a diameter of 8 mm for the cement floor plugs and 
one hole with a diameter of 19 mm for the cable access. It may be necessary to provide 
a groove for the power supply cable connected to the L-SP2 Electronics Unit. Insert the 
concrete floor plugs into the mounting holes. 
 
3.  Remove the pedestal from the box. 
4.  Remove the plastic cover from the both sides after removing the 4 fixing screws. 
 
Figure 10: L-SP2 Bottom (4 screws) 
 
 
 
5.  Engage the power supply cable in the electric sheath and if available the Ethernet cable in the 
other sheath (please refer to section 4.1.1 “Wire Feed Sheaths”). 
6.  Place the pedestal base over the mounting holes. Insert and fasten the screws in the mounting 
holes according to the type of ground surface: 
  Wood  floor:  Insert  the  screws  directly  into  the  mounting  holes  and  tighten  the  screws  in 
place.  
  Concrete  floor:  Insert  the  screws  into  the  concrete  floor  plugs  and  tighten  the  screws  in 
place. 
 
7.  Connect  the  cables  in  the  connection  box  as  show  in
  Figure  2 
with  respect  to  the  following 
rules: 
 
CAUTION:
  Always  use  a  protective  sleeve  for  main  power  cable,  which  match  to  the  non-
inflammability  standard.  Main  power  cable  must  be  a  3  wire  (line,  neutral  and  earth),  multi 
stranded copper wire, 0.5 mm²/ 3A) 
 
When tightening the screws in place, first tighten the screws in place ¾ of the way. Once all 
screws  are  in  place,  then  tighten  each  screw  progressively,  one  after  each  other  to  ensure 
that the floor bracket is solidly fixed into place and completely vertically aligned. The use of a 
level may be required. 
‘Phase’ wire is brown 
‘Neutral’ wire is bleu 
‘Ground’ wire is yellow/green