Huawei Technologies Co. Ltd ETS2558 用户手册

下载
页码 40
 
12
 
Vertically 
1.  Pull out the hook from the slot and turn it around. Then push it back so that the handset 
will not fall down when FWT is placed vertically. 
 
2.  According to the distance between the two hooks (7.7 cm), hammer two nails into the 
wall with a 3 mm end left outside. 
7.7cm
 
3.  Snap the hooks to the nails. 
Validating 
After installing the FWT, you can make a call to check whether it is correctly 
installed. 
1.  Press and hold 
  to power your FWT on. After connecting the FWT to the power 
socket, the 
  icon appears, indicating that the FWT is powered normally. 
2.  Lift the handset. In the standby mode, the signal strength icon
 appears normally. 
3.  If you can make a call, it indicates that the FWT is installed correctly.