AP 7161 Access Point Installation Guide 
 
 
Warnings 
• Read all  installation   instructions  and site  survey reports,  and verify correct equipment installation  before 
connecting  the access point  to its  power  source. 
 
• Remove jewelry and watches before installing  this equipment. 
 
• Verify that the unit is grounded before connecting it to the power source. 
 
• Verify that any device connected to this unit is properly wired  and grounded. 
 
• Connect all power cords to a properly wired  and grounded electrical  circuit.  Verify that the electrical circuits 
have appropriate  overload protection. 
 
• Attach only approved power cords to the device. 
 
• Verify that the power connector and socket are accessible at all times during the operation of the equipment. 
 
• Do not hold any component containing a radio such that it is very close to or touching any exposed parts of the 
body, especially  the face or eyes, while  transmitting. 
 
• Do not work with  power circuits in dimly lit spaces. 
 
• Do not install  this equipment or work with  its power circuits during thunderstorms or other weather conditions 
that could cause a power surge. 
 
• Verify there is adequate ventilation  around the device, and that ambient temperatures meet equipment 
operation specifications. 
 
• Avoid contact with  overhead power lines. 
 
• Take precautions to avoid injury from falling  tools  and equipment. Crews should wear  hard hats in and around 
the installation work site. 
 
• Be aware of vehicular traffic  in and around the installation  work site. 
 
• Do not operate a portable transmitter  near unshielded blasting  caps or in an environment where explosives are 
present unless the transmitter  is especially  certified  for such use. 
 
• Refer to your site survey and network  analysis reports to determine specific requirements for each deployment. 
 
• Assign installation  responsibility to the appropriate personnel. 
 
• Identify and document where all installed  components are located. 
 
• Identify and prepare Ethernet and console port connections. 
 
• Verify that cable lengths are within  the maximum allowable  distances for optimal signal transmission. 
 
 
 
CAUTION 
The maximum length  allowed  for PoE cables is 100 meters.