The devices  subject  to the  requirements  in this  KDB can select  the  initial   channel  for  operation  to avoid  TDWRs 
and apply the Uniform  Channel Spreading requirements  (see FCC 06-96   in  ET Docket 03-122 released June 30, 
2006) on the remaining  available frequency band of operation.  All  the other test  procedures including the test 
radar patterns  remain the same at the present time. A revision to the measurement procedure with modification 
to the Uniform Channel Spreading requirement  and other changes will be released in the future. The 
Commission will also address the issue of any field  upgrade option  at that  time. 
 
The grantee must identify  the specific  expertise  and the training  required by the installers for installing these 
types of devices. 
 
In some instances  it is possible  that  a device may be within  35 km of  multiple  TDWRs. In this  case the device 
must ensure that  it avoids operation  within  30 MHz for each of the TDWRs. This requirement  applies  even if the 
master is outside the 35 km radius but communicates with  outdoor clients  which  may be within  the 35 km 
radius of the TDWRs. 
 
The requirement  for  ensuring  30 MHz frequency  separation  is based on the best information   available  to date.  If 
interference is not eliminated, a distance limitation  based on line-of-sight   from  TDWR will need to  be used. In 
addition, devices with  bandwidths greater than 20 MHz may require greater frequency separation. 
 
• Procedures for the installers  and the operators on how to register the devices in the industry-sponsored 
database with  the appropriate information  regarding the location and operation of the device and installer 
information is included.6 
 
• Devices must meet all of the other requirements specified  in Section 15.407, and it is prohibited to include 
configuration  controls  (e.g. country code settings  or other options  to modify DFS functions)   to  change  the 
frequency of operations to any frequency other than those specified on the grant of certification  for US 
operation.7 
 
• All applications for equipment authorization must clearly show compliance with all of the technical 
requirements under worst  case parameters, under user or operator control, based on frame rates, listen/talk 
ratios  and user data transfer conditions. 
 
All  the  devices  subject  to  the  DFS requirements must be submitted  to the 
Commission’s Laboratory Division for 
pre-grant  testing  and equipment  authorization.8  The applicant  must ensure that all equipment authorization 
applications  subject to this interim  procedure include appropriate attestations  that the device has no option to 
change  the  DFS parameters and that transmissions are disabled at least in the 5600 
– 5650 MHz band. The 
application  must include the 
user’s manual with  the appropriate installation  and operations requirements for the 
installers  and operators. 
 
We are continuing to evaluate additional  measures that  may need to be taken to further  ensure against 
interference  caused by 5 GHz outdoor wireless  systems located near airports. While  manufacturers have an 
obligation  to ensure that their  equipment  complies with  FCC rules, and must take steps to ensure their devices are 
unlikely  to cause harmful  interference,  Section 15.5 of the 
Commission’s rules also places an obligation  on users 
of devices to avoid causing interference  and to correct any interference  that may occur.