Adtran 1287567G1 用户手册

下载
页码 24
ONT TA334RG Hardware Installation Manual
 
Notice 
ADTRAN have the sole right to make corrections, modifications, enhancements, improvements, and other changes to its products and services at any 
time and to discontinue any product or service without notice, ADTRAN has the final interpretation.   
 
13
 
3.8
 
Verifying the Installation 
 
Check LED states to verify ONT status (Section 3.8.1). 
Services  are  not  available  until  the  ONT  is  ranged  and  provisioned  in  the  PON  network.  If 
services  must  be  verified  at  the  time  of  installation,  refer  to  Section  3.8.2  for  additional 
instructions. 
 
 
3.8.1
 
Activating the ONT 
 
Once  the  ONT  installation  is  complete,  follow  the  procedure  below  for  verifying  ONT  status. 
Figures below shows the typical status LED display after the ONT boot sequence is complete. 
 
Figure 2 ONT has not yet been provisioned
 
 
   
 
Figure 3 ONT has already been provisioned
 
 
• Verify that the POWER LED light is green, indicating that local power level is good. 
• Verify that the LINK LED light is green, indicating that the ONT is operating normally. 
The  ONT  is  placed  into  service  remotely  through  the  OLT.  Services  to  the  ONT  are  likewise 
provisioned and turned up remotely through the PON network. 
-
 
If  the  LINK  LED  lights  green,  indicating  that  the  ONT  is  communicating  with  the  PON 
network, no further activation is necessary and you can proceed to Section 3.8.2: Verifying 
Services. 
-
 
If the LINK LED does not light green, contact the NOC 
(Network Operation Center) 
to activate 
the line. You may be required to provide or confirm the following information about the ONT: 
vendor, model number, serial number. Once the ONT has been activated in the network, and 
the LINK LED is lit green, you can proceed to Section 3.8.2: Verifying Services.