Roseman Engineering Ltd. FG3E 用户手册

下载
页码 44
 
 
Fleet Gate Installation Guide                                                                                    Roseman Engineering Ltd
 
 
31 
  
 
 
The Fueling Division of Roseman Engineering Ltd.  
                                                              
 
15.  The following screen will appear showing that the odometer calibration has completed    
successfully. 
 
 
 
16.  Double click the Read FleetJournal menu item and the following screen will appear 
showing the details about what was programmed on the vehicle.