Graco Inc. CED1 用户手册
Cleanup
3A0245A
11
Cleanup
Storage - Less Than 24 Hours
1.
Perform Pressure Relief Procedure, page 6 (valve
in down position).
in down position).
2.
Remove tool from valve. Clean all tools or use sup-
plied tool caps.
plied tool caps.
3.
Remove hopper lid and use water bottle to spray
enough water mist to cover top layer of material.
enough water mist to cover top layer of material.
4.
Clean hopper sides to material level. Cover material
in hopper with hopper cover.
in hopper with hopper cover.
Storage - More Than 24 Hours
1.
Perform Pressure Relief Procedure, page 6 (valve
in down position).
in down position).
2.
Hang drain line mount onto material bucket. Turn
pump to drain position and pump unused material
from hopper and hose.
pump to drain position and pump unused material
from hopper and hose.
3.
Scrape material remaining in hopper into pump to
be pumped from sprayer.
be pumped from sprayer.
4.
Turn pump control fully counter-clockwise to shut
pump off.
pump off.
5.
Fill material hopper with water and run pump to
flush hose and valve. Use standard garden hose
with nozzle to wash sprayer body.
flush hose and valve. Use standard garden hose
with nozzle to wash sprayer body.
6.
Shut pump off.
NOTICE
Do not use with quick-set materials. They can
harden inside the unit and hose.
harden inside the unit and hose.
ti11802a
ti8794a
ti11801a
ti11760a
ti8793a
ti11670a