Rosemount Tank Radar AB REX 用户手册

下载
页码 73
Saab TankRadar L/2
31
US Version. Seventh edition, June 1995
Installation Manual
1.
Customer receives the Installation Manual with the Required
System Information Form.
2.
The completely filled in Required System Information Form,
tank farm layout drawings and cabling drawings are sent to
Saab Tank Control representative 1-3 months prior to deliv-
ery, depending on system size.
3.
The Installation drawings are reviewed and approved by
Saab Tank Control or Saab Tank Control representative.
Allow approximately 2 weeks for review and return.
4.
Inspection at Saab Tank Control before delivery (when re-
quested).
5.
Customer receives and installs the TRL/2 System according
to the Installation Manual.
6.
Data sheets are completed and a system configuration chart
are made by the customer as a preparation for the start up of
the system. See Service Manual for instructions.
7.
System is started up by customer (after completed training)
or a Saab Tank Control Representative according to Service
Manual.
8.
Send Commissioning Check List to Saab Tank Control.