ADC Telecommunications Inc. FWM1901B 用户手册

下载
页码 36
ADCP-75-246 • Issue 1 • 6/2008
Page 25
© 2008, ADC Telecommunications, Inc.
Figure 16. Connecting AC Power Cable to Enclosure
10. Connect the power cable connector to the AC power port. 
11. Tighten coupling nut until the green band at the top of the connector body is visible. 
6.7
Touch-Up Painting
A brush-in-cap type bottle of paint (ACE-ACC-PTLAMD) is available for touching-up nicks
and scratches in the factory coat of paint. Lightly sand the area to be painted and then clean it
thoroughly to remove and dirt, dust, or foreign matter. Shake the paint bottle until thoroughly
mixed and then apply a light coat of paint to the damaged area using the small brush attached to
the cap. Wait until the paint is dry and apply a second coat if necessary. When finished painting,
replace the paint bottle cap and tighten securely. 
6.8
Power-Up and Testing
When the installation is complete, refer to the applicable publications for the system turn-up and
test procedures. To verify that the microBTS is ready to be placed into service, place the AC
breaker in the closed (on) position and observe the LED indicator light on the bottom of the
enclosure. The LED indicator should turn red immediately following power-up. The LED will
continue to stay red for up to 30 minutes following the initial power-up during which time the
microBTS will synchronize with an external clock source. When the microBTS timing has been
synchronized, the LED will turn off. 
BOTTOM VIEW
22641-A
POWER
CABLE
GREEN BAND WILL BE
VISIBLE WHEN COUPLING
NUT IS TIGHTENED