TransCore 05716 用户手册
4-3
Chapter 4
Installing the Multiprotocol Rail Reader
This chapter lists the materials needed and presents the procedures to
pre-test and install the Multiprotocol Rail Reader (MPRR).
pre-test and install the Multiprotocol Rail Reader (MPRR).
Installation Process
After you have developed the site plan and identified the location to install the MPRR
and antennas
1
, if required, you are ready to install the equipment. Installation involves
the following tasks:
•
Pre-installation testing of MPRR power and tag read capability
•
Mounting the MPRR in a railside shack
•
Mounting the railside antenna(s)
•
Connecting the antenna(s)
•
Connecting the MPRR power
•
Marking the read zone
•
Connecting the MPRR host and sense input/sense output and communications
Materials Supplied by TransCore
You need the following materials to pre-test and install the MPRR. TransCore supplies
some of the materials; other materials must be obtained from other sources.
some of the materials; other materials must be obtained from other sources.
Contents of Shipping Carton
Ensure that you have received all parts before beginning your pre-installation MPRR
tests. Your MPRR is packaged with the following materials:
tests. Your MPRR is packaged with the following materials:
•
One MPRR
•
One MPRR Quick Start Guide
•
Any accessories ordered as options as shown in
Required accessories are a power/communications cable harness and a 110V AC-to-
18V AC wall transformer, a 12 to 18V AC step-up transformer, or a 16 to 28V DC
power source. You also require at least one MPRR-compatible antenna and an antenna
RF cable. These may be ordered as accessories from TransCore or obtained from other
sources.
18V AC wall transformer, a 12 to 18V AC step-up transformer, or a 16 to 28V DC
power source. You also require at least one MPRR-compatible antenna and an antenna
RF cable. These may be ordered as accessories from TransCore or obtained from other
sources.
1.
The MPRR is designed with RF cable connectors for use with N-type RF cables.