4.7 INSPECTION 
In this section, the location of the installation is recorded and equipment configuration 
parameters are verified against the As Built. In addition, general workmanship and 
quality of assembly and installation are inspected 
NOTE
 
Only selected parameters are checked against the recorded factory configuration as all 
parameters are programmed into equipment before leaving the factory and hence should 
not require to be modified. 
4.7.1 
Pre-test Inspection 
Objective:  To verify that the site installation has been satisfactorily completed and that 
newly installed cable interfaces have been correctly connected, especially inter-rack 
cabling disconnected during shipment. 
NOTE
 
Before commencing this section of tests, ENSURE THAT ALL RACK CIRCUIT 
BREAKERS ARE IN THE OFF POSITION.
 
 
PRE-TEST 
INSPECTION 
ACTION 
MISCELLANEOUS 
1. 
A two rack three channel base station is 
as shown in the figure to the right. Rack 
1 (on left) contains system transceivers, 
communication interfaces and control 
and monitoring equipment; Rack 2 (on 
right) contains transmit path RF power 
amplifiers and combining equipment