CPAC Systems AB BTGW 用户手册
BB2
Title:
Revision:
Classification:
Page:
CPAC-BTGW: General Guidelines
- Installation and Operation
- Installation and Operation
PA1
Open within project
6(13)
3.4
Connecting requirements
– cables for EVC system
BTGW unit shall be connected to an EVC system according to this:
Picture #2 CPAC-BTGW
– connecting requirements for EVC systems
3.5
Connecting requirements
– cables for non EVC system
BTGW unit shall be connected to a non EVC system according to this:
Picture #3 CPAC-BTGW
– connecting requirements for non EVC systems