3. Installation
Page 24
MR Booster Manual (MN001808-1, 9/99)
3.4
Installation Checklist
The following checklist provides a summary of the procedures for installing an MR
Booster system.
Booster system.
Step
Item/ Action
Description
a
a
1
MR Booster Site Drawing
Master copy of the site plan noting the MR
Booster location and serial number.
Booster location and serial number.
2
Equipment List:
MR Booster
AC or DC power source
MR Booster
AC or DC power source
3
Installation tools:
M8 carriage bolts
M8 carriage bolts
To install mounting bracket
6mm and 4mm drivers
To mount cabinet to bracket, open door
Serial control cable
To connect terminal to booster
Laptop computer
To initialize booster
I
2
C bus cable (if applicable)
Coaxial cables
>30 dB, 60 W attenuator
RF power meter
Miscellaneous RF test cables
>30 dB, 60 W attenuator
RF power meter
Miscellaneous RF test cables
4
Run cable to site
Power, uplink, downlink, I
2
C (if applicable)
5
Mount the equipment
See Section 3.3.
6
Attach cables
Power, uplink, downlink, I
2
C (if applicable),
alarm outputs (if applicable)
7
Connect laptop computer to J6
on the logic controller board
on the logic controller board
For initialization.
8
Power up booster
9
Initialize booster
See Section 4, Setting Up for Initial
Operation
Operation
10
Close cabinet and screw shut
11
Optimize system
See Section 3.5, System Optimization
Table 3-4. Installation checklist