CartaSense Ltd. DASBRDUSG01 用户手册

下载
页码 64
 
Installation and operation
 
 
 Installation, Operation & Maintenance of the Wireless Sensing Family 
15 
 
3 Installation and operation 
Installation of a system site consists of the following stages; 
 
Planning – pre-installation. 
 
Assembling and mounting of the components.. 
 
Acceptance testing of overall system. 
3.1  Pre-installation Preparations 
Pre-installation preparations are crucial for a successful installation of the 
CartaSense system and must be performed precisely and thoroughly.  
The purpose of the pre-installation preparation is: 
• 
Identify  the  best  location  for  the  system  components  in  order  to 
optimize the performance of the system.  
• 
When  using  GPRS  USG  verify  availability  of  good  cellular 
communication in the area of installation.  
• 
Verify  high  enough  locations  for  mounting  USG  units  to  prevent 
them from being damaged by forklifts and loads.  
• 
Locate AC outlets - Verify power outlet availability near the USG’s 
planned location 
• 
Check for the best location to place a Resident Sensor, if any. This 
depends on:  
-  Size of area to be covered. 
-  Specific needs (special cooling rooms, far dockings…) 
• 
Estimate number of RS needed. 
• 
Check coverage 
• 
Add RS in places with low coverage  
3.1.1  Tools 
The installation team should to be equipped with the following tools: 
  Cellular phone SIM free with WEB surfing capabilities - a cellular 
phone that works with any SIM card and is capable of surfing the 
internet. 
  Laptop with cellular internet communication.  
  Safe SIM – A SIM card with all the characteristics, as described in 
paragraph ‎2.6.3 should be verified ahead of time that it is suited for 
operation with the CartaSense system. 
  Power cord extender. 
  Thin screw driver – to pull the SIM card compartment out. 
  Mini USB connector – for debug purposes.