Olympus Winter & Ibe GmbH ESG200 用户手册
38
Installation
Figure 4.2 Connecting the foot switch to the electrosurgical generator
2. Insert the foot switch plug into the foot switch socket.
3. Rotate the retaining ring clockwise until it is completely tight.
DRAFT
–
2017-01-17