Baicells Technologies Co. Ltd. PBS2120 用户手册

下载
页码 16
pBS2120 Base Station Installation Guide 
11 
 
4.  Adjust base station to proper angle and fasten the screws. 
 
Install on Wall 
4.2
The wall must bear four times of the base station weight. 
1.  Fit the base station on the wall, and mark the drilling locations. 
 
2.  Drill four 12mm diameter and 80mm depth holes in the wall by following the 
marked locations. 
3.  Check  the  up/down  direction  of  the  installation  rack,  and  then  fix  the  base 
station to the wall using M8*80 expansion screws.   
4.  When install on wall, the U shape clamp is not needed.  
5.  Fix the base station on the bracket and adjust to proper angle. 
 
 
Connect Cable 
4.3
4.3.1  Connect Ethernet Cable 
1.  Unscrew three screws on the cover of wiring cavity using M4 cross screwdriver and