Husqvarna 1827SB 用户手册

下载
页码 20
6
ASSEMBLY / PRE-OPERATION
AUGER
CONTROL 
LEVER
AUGER CONTROL ROD
AUGER
CONTROL 
BRACKET
RETAINER 
SPRING
FIG. 6
CHUTE
ROTATER 
HEAD
3/8 WASHER
3/8 LOCKNUT
THREADED  
STUD
PIN
ROTATER HEAD 
MOUNT ING 
BRACKET
CHUTE 
BRACKET
FIG. 7
ALIGN BEFORE
TIGHTENING LOCKNUT
INSTALL AUGER CONTROL ROD (See Figs. 5 and 6)
1.   Retrieve vinyl sleeve and spring from bag of parts and 
retrieve the auger control rod from carton chute tray.  
Slide straight rod end through the small hole in the 
vinyl sleeve. Hook spring in hole in rod end.
2.  Hook end of spring into control arm with loop opening 
up as shown. (See Fig. 5)
3.  With top end of rod positioned under right side of 
control panel, push down on rod and insert end of rod 
into hole in auger control bracket.  Secure with retainer 
spring.
AUGER
CONTROL 
ROD
CONTROL 
ARM
VINYL 
SLEEVE
LOOP 
OPENING 
UP
FIG. 5
INSTALL DISCHARGE CHUTE / CHUTE ROTATOR 
HEAD (See Fig. 7)
NOTE:
 The multi-wrench provided in your parts bag may 
be used to install the chute rotator head.
1.  Place discharge chute assembly on top of chute base 
with discharge opening toward front of snow thrower.
2.  Position chute rotator head over chute bracket.  If nec es-
 sary, rotate chute assembly to align square and pin on un-
 der side of chute rotator head with holes in chute brack et.
3.  With chute rotator head and chute bracket aligned, 
po si tion chute rotator head on pin and threaded stud 
of mounting bracket.
4.  Install 3/8 washer and locknut on threaded stud and 
tighten securely.
CHECK TIRE PRESSURE
The tires on your snow thrower were overinflated at the fac-
tory for shipping purposes.  Correct and equal tire pres sure 
is important for best snow throwing performance.
•  Reduce tire pressure to 14-17 PSI.
Get user manuals: 
See SafeManuals.com