Roberts Gorden Caribe CGTH-30 用户手册

下载
页码 58
SECTION 5: V
ENTING
 I
NSTALLATION
  
25
9. Attach 3" (80 mm) elbow portion of 90° elbow kit to 
the 3" (80 mm) flue pipe (length 'A'). Use high 
temperature silicone sealant and 3 sheetmetal 
screws. 
(See Figure 21)
FIGURE 21: Elbow Assembly
10. Completely assemble the 3” (80 mm) vent 
lengths A, B and elbow and attach to the heater. 
Put the vent collar on the 3” (80 mm) vent. All 
joints must be sealed with high temperature    
sealant and sheet metal screws. (See Figure 22)
FIGURE 22: Elbow Assembly for Vent Collar
11. Attach the vent collar to the heater. Hold the 5” 
(125 mm) vent material up to the 3" (80 mm)  vent 
and mark the required length. Note the length 
must be sufficient for a minimum of 1 1/2” (38 mm) 
overlap at both ends. Cut the vent to length from 
the non crimped end. Wrap the 3” (80 mm) tube 
with the 5” (125 mm) vent and snap the vent 
together. Attach the 5” (125 mm) vent at both 
ends. All joints must be sealed with high tempera-
ture sealant and sheet metal screws. (See Figure 
23
)
FIGURE 23: Vent Collar and 5" Vent Attachment
12. Insert vent terminal and repeat step 11 for 5” (125 
mm) from the elbow through the wall.  Secure the 
vent terminal to the exterior surface of the wall.
NOTE: If the protruding 3" (80 mm) flue pipe is 
directly below and within 24" (610 mm) of the 
building soffit, the optional vent extension 
should be used and secured with three sheet-
metal screws.
High
Temperature
Silicone
3x Self
Drill Screws
Spring
5” (125 mm)
Elbow
Heater
5” (125 mm) Vent Collar
Stainless
Steel Tab
on
Turbulator
3x Self Drill Screws and
High Temperature Silicone
Spring
3” (80 mm)
5” (125 mm)
3x Sheetmetal Screws and
High Temperature Sealant
1 1/2” Min. (38 mm)
1 1/2” Min.
(38 mm)
1 1/2” Min. (38 mm)
1 1/2” Min. (38 mm)
Get user manuals: 
See SafeManuals.com