Avaya Integral 5 Easy BNS AR2.X 4999108504 用户手册
产品代码
4999108504
06/07
226
4.999.112.593
Installation manual Integral 5 D/E easy
Commissioning
Start up the system
Reset
Start up the system
Before starting up the system, ensure that the mains socket to which the system is connected
is at 230 V AC.
Observe the instructions in the section on earthing
Insert the common multi-socket extension (with the plugs of the units inserted)
Insert the common multi-socket extension (with the plugs of the units inserted)
into the appropriate mains socket or switch multi-socket extension on
The operating software is loaded.
Reset - warm start
Warm start the PABX Integral 5 as follows:
Use either ISA or Terminal code
or
Integral 5 without battery (PB1):
Unplug the common multi-socket extension
Wait approx. 15 seconds and plug the common multi-socket extension in again
Integral 5 with battery (PB1):
Remove the cover of PB1 (open PB1)
Disconnect the (battery) low-profile plug
Unplug the common multi-socket extension
Wait approx. 15 seconds and plug the common multi-socket extension in again
Reconnect the (battery) low-profile plug
The system will start up with the customer data