HP TFT7210R 348373-B21 产品宣传页
产品代码
348373-B21
Objective:
Deliver better, faster services to a growing number of
users, without increasing IT staff.
Approach:
Move to more robust, easier-to-deploy server
infrastructure based on HP ProLiant DL360 and DL380
G5 servers using HP SmartStart technology, and deliver
centralized remote management with HP Systems
Insight Manager.
IT improvements:
• 75% reduction in server deployment time
• 85% decrease in server management and
administration
• 40% reduction in storage costs
• 17% reduction in power consumption
Business benefits:
• Supported 15% user increase
• Tripled user mailbox storage capacity
• Enables more IT flexibility in meeting project
requirements
• Supports network-wide use of Outlook Web Access
• Decreased operating costs through reduced power
consumption
• HP Care Pack Services reduces administrative time
spent looking for parts and service
“HP servers are extremely flexible, and that saves us time and money whenever
we need to scale our infrastructure for a new project. In an education
environment, we’re often asked to do a lot more with a lot less, and HP really
enables us to do that.”
– Duke Miller, Network Services Manager, Agnes Scott College
College maximizes IT budget with HP ProLiant Servers
Agnes Scott College reduces server administration time by 85% with scalable HP server infrastructure
HP customer case study: Agnes Scott College
Industry: Higher Education
Infrastructure for a High-Volume Network
Founded in 1889, Agnes Scott College is an independent
national liberal arts college for women located in
metropolitan Atlanta. Every year staff and faculty, with
backgrounds in more than 30 areas of expertise, welcome
more than 900 students from 26 countries.
A higher education environment can be one of the most
challenging for an IT department. With today’s students
literally learning at the speed of technology, IT must support
a wide variety of business and educational objectives—
and often with limited resources. Agnes Scott is no different.
With approximately 1,600 users on its network every day
during the academic year and an on-site IT team of fewer
than 20 individuals, the network infrastructure needs to be
robust and easy to manage.