Hitachi RAC-25FXA RAC25FXA 用户手册
产品代码
RAC25FXA
10-25
2. Opening on ceiling and suspension bolt position
•
Indoor unit
FRONT VIEW
SIDE VIEW
•
Chamber of suction grille
PLANE VIEW
FRONT VIEW
SIDE VIEW
•
Chamber of discharge grille
FRONT VIEW
SIDE VIEW
PLANE VIEW
•
Arrange drain pipe, refrigerant pipe and
connecting cord in their installation position.
connecting cord in their installation position.
•
For finishing of opening on ceiling, arrange with
builder in detail
builder in detail
3. Installation of suspension bolt
•
Be sure to reinforce furring of ceiling (frame:
ceiling joint and supporter) to maintain level of
ceiling and prevent vibration of ceiling plate.
ceiling joint and supporter) to maintain level of
ceiling and prevent vibration of ceiling plate.
•
Suspension bolts should be purchased in the field
•
Refer to diagrams shown below or length of
suspension bolts.
suspension bolts.
•
In case of wooden frame
790
750
750
330
210
75
Abover 300
Abover 300
A
b
o
ver
30
0
Suspension bolt
(M10: local purchase)
54
150
400
205
54
28
347
Suspension bolt
(M10: Local purchase)
(M10: Local purchase)
186
235
194
58
274
206
Opening on ceiling 960
Suspension bolt 793
132
35
Ope
nin
g o
n c
eiling
2
33
116.
5
Gr
ille
253
10
10
Grille 980
229
300
Suspension bolt
position 793
Opening on ceiling 960
Suspension bolt 793
Grille 980
Suspension bolt
position 793
116.
5
Ope
nin
g o
n c
eiling
2
33
Gr
ille
253
10
10
132
300
229
262
186
56
253
Above 300
Above 300
860
199
310
Reinforcement
A
b
o
ve 330
47
98
Suspension bolt
(M10: Local
purchase)
Ceiling
Above 200
110
47
270
178
Opening on ceiling
Suspension bolt
position 740
53
740
53
48
96
60~90mm square piece of lumber
Nut
Angle
Angle
Nut
Suspension
bolt M10
About 130
Ceiling
740