Texas Instruments DS90UB925Q Evaluation Module DS90UB925QSEVB/NOPB DS90UB925QSEVB/NOPB 数据表

产品代码
DS90UB925QSEVB/NOPB
下载
页码 35
User’s Guide 
Sept 2012 
 
DS90UB925QSEVB User’s Guide 
 
Sept
 
2012 
DS90UB925QSEVB User’s Guide 
 
LIST OF FIGURES ....................................................................................................................................... 1
 
LIST OF TABLES ......................................................................................................................................... 1
 
1.
 
INTRODUCTION ............................................................................................................................. 2
 
1.1.
 
CONTENTS OF DS90UB925QSEVB ............................................................................................. 2
 
1.2.
 
HIGHLIGHTS OF EVB .................................................................................................................... 2
 
1.3.
 
OPERATION – QUICK SETUP ....................................................................................................... 3
 
1.4.
 
TROUBLE SHOOTING THE EVB ................................................................................................... 3
 
2.
 
BOARD SETUP DETAILS .............................................................................................................. 4
 
2.1.
 
POWER CONNECTIONS ................................................................................................................ 4
 
2.2.
 
FPD-LINK III CONNECTION ........................................................................................................... 4
 
2.3.
 
FACTORY SET SWITCH SETTINGS AND JUMPERS DEFAULT CONFIGURATION ................ 4
 
2.4.
 
LVCMOS INPUT CONNECTOR DESCRIPTION ............................................................................ 5
 
3.
 
APPENDIX – I2C, INTEGRATED SPA DONGLE .......................................................................... 6
 
3.1.
 
I2C SPA DONGLE HOOKUP .......................................................................................................... 6
 
3.2.
 
IDX BOARD DEFAULT ADDRESS ................................................................................................ 6
 
3.3.
 
ALP SOFTWARE SETUP ............................................................................................................... 7
 
3.3.1.
 
SYSTEM REQUIREMENTS ............................................................................................................ 7
 
3.3.2.
 
CD CONTENTS ............................................................................................................................... 7
 
3.3.3.
 
INSTALLATION OF THE ALP SOFTWARE .................................................................................. 7
 
3.3.4.
 
INSTALLATION OF THE USB DRIVER ......................................................................................... 8
 
3.3.5.
 
STARTUP - SOFTWARE DESCRIPTION ...................................................................................... 8
 
3.3.6.
 
TROUBLE SHOOTING ALP SOFTWARE ................................................................................... 15
 
4.
 
APPENDIX – USE OF OPTIONAL ROSENBERGER HSD CONNECTOR (J1) .......................... 18
 
5.
 
APPENDIX – USE OF OPTIONAL MINI-B USB CONNECTOR (J2)........................................... 18
 
6.
 
APPENDIX - BOARD LAYOUT .................................................................................................... 18
 
7.
 
SCHEMATIC .................................................................................................................................. 25
 
8.
 
BILL OF MATERIALS ................................................................................................................... 30
 
 
LIST OF FIGURES 
 
Figure 1: DS90UB925Q EVB ........................................................................................................................ 2
 
Figure 2: Factory Switch (S1,S2,S3,S4) and Jumper (JP2) Configuration ...................................................  5
 
Figure 3: Initial ALP Screen .......................................................................................................................... 9
 
Figure 4: TOP View ..................................................................................................................................... 19
 
Figure 5: BOTTOM View ............................................................................................................................. 20
 
Figure 6: TOP Layer ................................................................................................................................... 21
 
Figure 7: GND Layer ................................................................................................................................... 22
 
Figure 8: PWR Layer .................................................................................................................................. 23
 
Figure 9: BOTTOM Layer ........................................................................................................................... 24
 
 LIST OF TABLES
 
Table 1: Bill of Materials .............................................................................................................................. 30