C Control PRO MINI STATION 198777 数据表

产品代码
198777
下载
页码 28
14
8. Connection and Operation
Connect the two adjacent clamps "+UB" and "GND" of the "X1" terminal strip to the operating
voltage.
The green LED "POWER ON" indicates that the "C-Control PRO Mini-Station" is supplied with
voltage and in operation.
At delivery, a small test programme is pre-installed on the "C-Control PRO
Mini-Station" by default.
This will activate a running light  when the operational voltage is connected.
Caution:
Only perform any assembly work or wirings when the "C-Control PRO Mini-
Station" is powered down. Otherwise, there is a danger of short-circuit or static
discharge, which would destroy the "C-Control PRO Mini-Station and all
connected devices!
Always ensure correct polarity when making connections! The "C-Control PRO
Mini-Station" has no internal protection against polarity reversal! The product
and any possibly connected devices will be destroyed in case of polarity
reversal. Loss of warranty/guarantee!
Only a stabilised direct current between 9V/DC and 16V/DC may be used for
power supply. Otherwise, the "C-Control PRO Mini-Station will be destroyed!
The "C-Control PRO Mini-Station" power input is at a maximum of approx.
200mA at an operational voltage of 12V/DC when all relays are switched on
and I/O outputs are switched with a load of 10mA each.