Mc Crypt DB-S8 Fog Machine 591182 数据表

产品代码
591182
下载
页码 57
22
6. Installation/Setup
Acceptance test (in case of industrial/public use):
Before first use and after any significant modifications, the installation (including the electrical
connections) must be checked by an official expert.
A yearly inspection by a technical expert is required.
At least every four years, a quality inspection must be carried out by an official expert.
• Set up the fog machine taking into account the above safety notices or mount it on the wall. For this purpose, you
will find bores on one of the casing walls for hanging it into screws. When mounting the device on the wall, make
sure to use screws with appropriate heads and dowels that are suitable for the type of wall and designed for
supporting the weight of the fog machine.
• The distance between the mounting holes is 127mm.
• When installed/set up in an elevated position, secure the fog machine with an additional suitable safety restraint
cable or safety net. The safety restraint cable or safety net must be able to support the fog machine in the event
of a fault.
7. Electric Connection
If, after the fog machine has been installed, the mains plug is not accessible anymore or if it is
accessible but with difficulty for disconnecting the device from the mains, the voltage supply
must be separated from the mains via an all-pole switch.
Do not leave cables lying or hanging around; instead, install them in an expert manner to
prevent accidents.
• Install the connection cable for the remote control up to the site from which you are going to control the device.
• Plug the connection plug of the remote control into the CONTROL port on the fog machine.
• The back of the remote control is magnetic. The remote control thus sticks to metallic objects.
• The mains plug must be plugged into an earthed power outlet to operate the device. However, do not plug the
mains plug in yet. Before connecting the device to the power supply, you first have to fill the tank with fog liquid
(see “Operation”).