Utica Boilers SSV 安装指导

下载
页码 88
86
150/200 MBH - PRIMARY LOOP EQUIVALENT LENGTH CALCULATION & PUMP SELECTION 
For 150/200 MBH Boilers
(This boiler must be piped with a primary loop)
These charts are valid for piping diagrams on pages 17 & 18
Instructions:
1. 
Pipe diameter determines pump size. Smaller the diameter of pipe, larger the pump. 150/200 Mbh boilers can be 
piped in 3/4" , 1" or 1¼" pipe. Use charts 1-4 to determine pipe size and respective pump size.
2. 
Fill in chart using the 1" section first. Then consult chart 4 for pump selection. 
3. 
Pump size may be decreased by decreasing equivalent length of pipe. Use larger diameter pipe as primary loop to 
decrease equivalent length. Use charts 2 or 3.
Note: The figures below are based on industry average. Consult valve/fitting manufaturer for exact equivalent length or 
for fittings not shown below.
Chart 1
A
B
C
Pipe Diameter
Fitting
Enter Number of 
Fittings
Multiply By
Equivalent Length
A x B
1"
90° Elbow
2.5
45° Elbow
1.3
Tee-branch
5.0
Tee-through
1.7
Swing check valve
8.3
Lift check valve
50.0
Enter Total 1" straight pipe length in feet
Add  up  numbers  in  column  C                                                    
Total equivalent length of Primary
Pump Factor
Chart 2
A
B
C
Pipe Diameter
Fitting
Enter Number of 
Fittings
Multiply By
Equivalent Length
A x B
1¼"                              
(Any pipe/fitting 
larger than 1¼",    
count as 1¼")
90° Elbow
3.1
45° Elbow
1.7
Tee-branch
6.3
Tee-through
2.1
Swing check valve
10.4
Lift check valve
62.5
Enter Total 1¼" straight pipe length in feet
Add  up  numbers  in  column  C                                                             
Total equivalent length of Primary
Multiply Total of Column C in Chart 2 by 0.35
Pump Factor