HP Performance Optimized Data Center (POD) 20cp 参考指南
Index 36
A
about this guide 5
areas prone to lightning or power surges 20
C
capacity limitations 7
clearance area 8
connection portals 16
connections, additional 16
connections, facility 16
D
delivery considerations 28
dimensions 8
drainage 12
E
environmental considerations 20
environmental control system (ECS) 16
environmental risks 20
equipment, installation 22
F
facility connections 16
fire and safety 18
fire suppression 6
future expansions 10
G
grounding requirements 11
H
HP site preparation drawing package 21
I
installation 22
installation equipment 22
L
lifting layout and requirements 22
lightning protection 20
M
materials, piping 14
O
other objects 24
overview 5
P
power infrastructure installation 14
power surges 20
project coordination 21
R
regulatory compliance identification numbers 32
regulatory compliance notices 32
S
seismic activity 20
site pad 8
Index