HP Performance Optimized Data Center (POD) 20cp 参考指南

下载
页码 37
 
Index  36 
A 
about this guide   5 
areas prone to lightning or power surges   20 
assembly   28 
assembly area   22 
C 
capacity limitations   7 
clearance area   8 
cold weather considerations   20 
communication connections   18 
connection portals   16 
connections, additional   16 
connections, facility   16 
D 
delivery considerations   28 
dimensions   8 
drainage   12 
E 
electrical power capacity   7 
electrical system   14, 15 
environmental considerations   20 
environmental control system (ECS)   16 
environmental risks   20 
equipment, installation   22 
F 
facility connections   16 
fire and safety   18 
fire suppression   6 
future expansions   10 
G 
grounding requirements   11 
H 
HP site preparation drawing package   21 
humidifier   12, 17 
I 
installation   22 
installation equipment   22 
L 
lifting layout and requirements   22 
lightning protection   20 
M 
materials, piping   14 
mechanical cooling capacity   7 
modifications, FCC notice   32 
O 
other objects   24 
overview   5 
P 
permit requirements   21 
piping materials   14 
power infrastructure installation   14 
power surges   20 
pre-delivery   28 
preparing for assembly   28 
project coordination   21 
R 
regulatory compliance identification numbers   32 
regulatory compliance notices   32 
regulatory compliance, HP POD 20c   5, 31 
S 
safety information   6, 32 
security   6, 18 
seismic activity   20 
site assessment   6, 21, 25 
site assessment checklist   25 
site pad   8 
Index