Wayne-Dalton 9600 用户手册

下载
页码 40
Tools Needed:
10
Please Do Not Return This Product To The Store. Contact your local Wayne-Dalton dealer. To find your local Wayne-Dalton dealer, refer to your 
local yellow pages/business listings or go to the 
Find a Dealer section online at www.Wayne-Dalton.com
hEADROOM REqUIREMENT
Preparing the Opening
WARNINg
TRACk TyPE
TorqueMaster
®
 15” Radius track
11-3/4” (299 mm)
12” Radius track
10-1/2” (267 mm)
6” lHR kit
6” (152 mm)
DOOR hEIghT
TRACk
MANUAl 
lIFT
MOTOR 
OPERATED
6’5”, 6’6”, 7’0” 12”, 15” Radius
98” 
(2489 mm)
120” 
(3048 mm)
7’6”, 8’0” 
12”, 15” Radius
110” 
(2794 mm)
132” 
(3353 mm)
WEaTHER sEal
bACkROOM REqUIREMENT
HEaDROOM
BaCkROOM
DOOR
WIDTH
DOOR 
HEIGHT
lEVEl HEaDER
PluMB jaMBs
HEaDER BOaRD 
2” x 6” luMBER 
PREfERRED
suITaBlE MOuNTING 
suRfaCE 2” x 6” 
luMBER MINIMuM
P5
Recommended 
tools from 
page 5
HEaDER
jaMB
jaMB
quICk INsTall TRaCk
jaMB
WEaTHER 
sEal
faIluRE TO sECuREly 
aTTaCH a suITaBlE 
MOuNTING PaD TO sTRuCTuRally sOuND 
fRaMING COulD CausE sPRINGs TO VIOlENTly 
Pull MOuNTING PaD fROM Wall, REsulTING 
IN sEVERE OR faTal INjuRy.
If you just removed your existing door or you are installing a new 
door, complete all steps in PREPaRING THE OPENING. 
for detailed technical information regarding the opening 
preparation, refer to the DasMa Technical Data sheet TDs #161 
Connecting Garage Door jambs to Building. framing located at 
www.dasma.com. 
The inside of your garage door opening should be framed with 
wood jambs and header. It is recommended that 2” x 6” lumber 
be used. The jambs must be plumb and the header level. The 
jambs should extend a minimum of 12” (305 mm) above the 
top of the opening for TorqueMaster
® 
 counterbalance systems. 
for low headroom applications, the jambs should extend to 
the ceiling height. Minimum side clearance required, from the 
opening to the wall, is 3-1/2”.
IMPORTANT: ClOsEly INsPECT jaMBs, HEaDER aND MOuNTING 
suRfaCE. aNy WOOD fOuND NOT TO BE sOuND, MusT BE 
REPlaCED.
The jambs and header must be securely fastened to sound 
framing members. Do not place jambs and header over drywall, 
paneling, etc. Heads of fasteners must be flush or below jamb 
and header surface, so they do not interfere with installation or 
operation of new door.
TorqueMaster
®
 counterbalance systems, a suitable mounting 
surface must be firmly attached to the wall, above the header at 
the center of the opening. 
The mounting surface must be 2” x 6” lumber minimum (select 
southern yellow pine lumber. Do not use lumber marked as 
spruce-pine-fur or sPf). 
The mounting surface must be securely attached to block or 
concrete wall with four (4) 3/8” masonry anchors or four (4) 
5/16” x 4” lag screws for a wood structure. 
NOTE: Drill a 3/16” pilot hole in the mounting surface to avoid 
splitting the lumber. Do not attach the mounting surface with 
nails.
WEAThER SEAl: fit weather seal (may not be included) to fit the 
jambs and header. align the edge of the weather seals an 1/8” to 
1/4” inside the edge of the opening. Temporarily nail the weather 
seal to the jambs to keep the bottom section from falling out of 
the opening during installation. space nails approximately 12” 
apart.
NOTE: Do not permanently attach weather seal to the jambs at 
this time. Permanent installation will be done in step 34.
hEADROOM REqUIREMENT: Headroom is defined as the space 
needed above the top of the door for tracks, springs, etc. to allow 
the door to open properly. If the door is to be motor operated, 
2-1/2” (64 mm) of additional headroom is required.
NOTE: 6” lHR Conversion kit is available for 12” Radius only. 
Contact your local Wayne-Dalton
®
 dealer.
bACkROOM REqUIREMENT: Backroom is defined as the 
distance needed from the opening back into the garage to allow 
the door to open fully.