Utica Boilers MGB Series II/MGC Series 安装指导

下载
页码 28
13
1.
Verify only boiler is serviced by Vent Damper. Figure
11.
2.
Clearance of not less than 6 inches (152mm) between
Vent Damper and combustible material must be
maintained. Additional clearance should be allowed for
service of Vent Damper.
3.
Vent Damper must be in the open position when
appliance main burners are operating.
4.
Vent Damper position indicator must be in visible
location following installation.
5.
Thermostat's heat anticipator must be adjusted to
match total current draw of all controls associated with
boiler during heating cycle.
7 - VENT DAMPER INSTALLATION & INSTRUCTIONS
Figure 10 - Damper Motor Wiring
Figure 11 - Vent Damper Placement
DAMPER INSTALLATION
Follow Damper installation instructions provided with 
damper. See Figure 10.
Damper Motor
Vent Outlet
Vent Damper
Damper Wire 
Haness
Limit Control
REFER TO DAMPER MANUFACTURER'S
INSTALLATION INSTRUCTIONS FOR
POSITION OF DAMPER
CONTROL BOX
ACCEPTABLE VENT
DAMPER LOCATIONS
BOILER
HOT WATER HEATER
CHIMNEY
UN-ACCEPTABLE
DAMPER LOCATIONS
DAMPER INSTRUCTIONS