Utica Boilers MGB Series II/MGC Series 安装指导
15
10 - ELECTRICAL WIRING
Electrically bond boiler to ground in accordance with
requirements of authority having jurisdiction. Refer
to National Electrical Code, ANSI/NFPA 70.
ELECTRIC POWER SUPPLY
Run separate 120 volt circuit from separate over
Run separate 120 volt circuit from separate over
current protective device in electrical service entrance
panel. This should be a 15 ampere circuit. Locate
shut-off switch at boiler. It must be turned off during
any maintenance. Connect 120 volt power supply to
control leads L1 (HOT) and L2.
LWCO kit 550002998 includes wiring instructions and
LWCO kit 550002998 includes wiring instructions and
diagrams. If using another LWCO, refer to specific
manufacturer instructions supplied by appropriate
manufacturer.
Run a 14 gauge or heavier copper wire from boiler
Run a 14 gauge or heavier copper wire from boiler
to grounded connection in service panel or properly
driven and electrically grounded ground rod.
THERMOSTAT INSTALLATION
1.
Thermostat should be installed on an inside wall
about four feet above the floor.
2.
NEVER install thermostat on outside wall.
3.
Do not install a thermostat where it will be
affected by drafts, hot or cold pipes, sunlight,
lighting fixtures, televisions, a fireplace, or a
chimney.
4.
Check thermostat operation by raising and
lowering thermostat setting as required to start
and stop the burners.
5.
Instructions for the final adjustment of the
thermostat are packaged with the thermostat
(adjusting heating anticipator, calibration, etc.)
Set heat anticipator at .2 amps. 24 volt thermostat
connects to aquastat terminals T and TV.
WARNING
Electrical shock hazard. Turn OFF electrical
power supply at service panel before making
electrical connections. Failure to do so could
result in death or serious injury.
!
NOTICE
Label all wires prior to disconnection when
servicing controls. Wiring errors can cause
improper and dangerous operation. Verify
proper operation after servicing.
VENT DAMPER WIRING
Boiler is equipped with factory wired harness with 4
pin molex plug, that plugs into 4 pin molex receptacle
inside vent damper operator.
Vent damper must be connected for boiler to operate.
If any of the original wire as supplied with this
appliance must be replaced,
It must be replaced with type 105°C thermoplastic
wire or its equivalent.