Polaris TBM 200 LH 用户手册

下载
页码 50
 
 
 
 
 
ENGINEERING STANDARD PROCEDURE 
IMPELLER INSTALLATION – TECH BULLETIN 
1of 2 
DOCUMENT NBR. : 
PED-016 
REVISION:  
EFFECTIVE 
DATE: 
09-26-2003 
 
 
 
0  
NEW 
UJB  
08-15-02 
1  
ADDED250LH 
UJB 
 
09-26-03 
REV ECN  CHANGE 
DESCRIPTION 
BY 
APPV’D 
DATE 
1.0 SCOPE:
 
The purpose of this Engineering Standard Document is to define the procedure to be 
followed in installing the Impeller and Impeller Lock Screw. 
 
2.0 METHOD: 
 
 
 
 
 
 
 
 
 
2
2
.
.
1
1
 
 
 
 
I
I
m
m
p
p
e
e
l
l
l
l
e
e
r
r
 
 
I
I
n
n
s
s
t
t
a
a
l
l
l
l
a
a
t
t
i
i
o
o
n
n
 
 
Clean all parts prior to impeller installation. 
Apply “Never Seize” or similar to Impeller bore, Shaft and 
Key. 
Install Impeller onto Shaft. Using a grease remover or 
solvent, remove all grease, oil or preservative from the shaft-
end internal threads and dry.     
 
 
 
 
 
 
2
2
.
.
2
2
 
 
 
 
I
I
m
m
p
p
e
e
l
l
l
l
e
e
r
r
 
 
B
B
l
l
o
o
c
c
k
k
i
i
n
n
g
g
 
 
 
Position an Open End or Box / Open End Wrench Using one 
of the Strainer Bolts as shown. Place a piece of Wood 
between the Impeller and Wrench. 
 
Note: Reverse Wrench Location to opposite side for Impeller 
removal.