SpectraLink Corporation 
T1 Remote Module Installation 
 
Link WTS – Link 3000 MCU 
2. Site 
Preparation 
The following steps must be completed before installing the system hardware.  If the 
steps are not already completed refer to each individual section for details. 
1.  At the local site, install and test Primary Shelf and Expansion Shelves.  Refer to 
Link WTS – Link 3000 MCU: Installation (72-0059-01) for information. 
2.  At the remote site: 
2.1  Install a two pair cable to each Base Station as designated on the building 
floorplans. 
2.2  Terminate the Base Station wiring with RJ-45 crimp-on plugs at the 
designated Base Station locations. 
2.3  Terminate the Base Station wire at the appropriate cross-connect demarc 
blocks. 
2.4  Terminate the analog or digital phone extensions from the phone system at 
the appropriate cross-connect demarc block, and label the block. 
2.1  Required Materials Provided by Customer 
 
Rack
 - the shelves are designed to fit into a 19 inch mounting rack. Each shelf 
measures 15” high by 19” wide by 9” deep, and weighs approximately 35 pounds 
fully loaded.  See Prepare Location for Shelves, in the Link WTS – Link 3000 MCU: 
Installation
 document. 
 
Backboard
 
space
 – as an alternative to rack mounting, the shelves can be wall 
mounted to ¾” plywood securely screwed to a wall. 
 
Screws
 – required to mount the shelves to the wall, or to secure it in the rack.  For 
wall mount, six #10-5/8” panhead wood screws (or similar device) are required.  For 
rack mount, screws required are determined by the rack requirements; typically 10-32 
or 1/4-20.   
 
RJ
-
45
 
Cable
 - for network clocked T1 facilities, an RJ-45 cable is required to 
connect the designated Master Clock T1 Module to the Intershelf Junction Panel. 
Part Number: 72-0059-06-E.doc 