New Buck Corporation 81 用户手册

下载
页码 39
FINAL CHECK 
 
1.  Recheck the specified clearances. 
 
2.  Remove all foreign material from the firebox area. 
 
3.  Open the primary air draft. 
 
NOTE:  Plug the power cord into a 115V AC outlet.  Set switch to “Manual” and rheostat to 
“High” position to ensure motor operates properly. Route the cord to prevent damage to the 
cord insulation from heat and sharp objects.  Keep the cord out of the way of traffic to  prevent 
damage caused by tripping, etc.  
 
4.  Place crumpled pieces of newspaper in the stove.   Light  it and  close  the  doors.  Ensure 
that  the  stove  draws  properly through the primary draft. 
 
5.   Check for smoke leaks around the doors. 
 
 
 
CAUTION 
 
 
Open the doors and check for smoke escaping from the front of the stove. Smoking usu-
ally indicates a defective or poorly positioned chimney. Some chimneys with a marginal 
draft can be preheated by lighting newspaper and holding it near the open damper with a 
poker or fire tong. Once the chimney heats up, a proper draft can usually be obtained. 
 
 
If a thorough review of the Troubleshooting Guide in the rear  of the  manual does not reveal 
the problem, contact your dealer  for assistance. 
 
CAUTION 
 
The unit is painted with a specially formulated high  temperature paint that cures during 
the first two or three firings.  You  may notice a slight smoking effect and an odor of 
burning paint  when you build the first fires.  This is normal and is not a cause  for 
alarm.   In some cases, these fumes will activate a smoke  alarm.  Opening a window near 
the unit will allow these fumes to escape.  DO NOT build a large, roaring fire until this 
curing is  complete or the heater finish may be damaged. 
20