Jagermeister Beverage Dispenser JEM 用户手册

下载
页码 28
 
- 19 - 
Chapter 6 
Plug It In, Turn It On, And Load It! 
 
 
1. 
Unsnap the 3 protective dust caps from the bottle well assembly located 
on  the  top  of  the  dispenser.    These  caps  should  not  be  removed  and 
should be snapped in place when a well space is not being used.  
 
IF  THIS  IS  THE  FIRST  USE  FOR  THE  MACHINE,  REMOVE  ANY 
ABSORBANT  MATERIALS  IN  EACH  WELL.    ALSO  REMOVE  THE 
PROTECTIVE CAP ON THE OUTPUT OF THE FAUCET 
 
2. 
Plug in the power cord of the machine into a 115VAC, 60 Hz. 15 Amp, 
3-pronged  power  receptacle  within  5  feet  of  the  rear  of  the  unit.   
DO 
NOT USE AN EXTENSION CORD OR SURGE SUPPRESSOR.  
 
If the power switch is "ON", the built in lighting will be on. If the lighting 
does not come on, turn the power switch to the “On” position.    
 
3. 
Unscrew  the  caps  from  3  fresh  bottles  of  Jägermeister  and  insert  the 
tapered  end  of  the  bottle  stoppers  as  described  in  'Bottle  Stopper 
Insertion and Removal" above.  The bottle stoppers are spring actuated 
and  prevent  dispensing  until  they  are  inserted  into  the  bottle  well 
assembly.
 
 
4. 
            Place  each  of  the  Jägermeister  bottles  on  the  top  of  the  machine  by 
inverting  the  bottle  and  inserting  the  barrel  end  of  the  bottle  stopper 
assembly  into  the  bottle  well  assembly  until  the  collar  of  the  bottle 
stopper  rests  inside  the  bottle  well  assembly  flange.  The  Jägermeister 
flow into the machine is automatically activated when the bottle stopper 
is placed correctly into the bottle well. 
  
THE MACHINE WILL LOAD A TOTAL OF APPROXIMATELY 1 ½ 
Liters OR ABOUT 53 OUNCES OF JÄGERMEISTER.  
 
5. 
If  the  power  switch  is  not  in  the  “On”  position,  place  it  in  the  “On” 
position.  Allow  30  minutes  for  the  system  to  chill  down  before 
dispensing  shots  of  Jägermeister.    When  the  refrigeration  switch  is  in 
the  "On"  position  and  the  level  indicates  “F”,  the  refrigeration 
compressor and the condenser fan will begin to run within 2 minutes.  It 
is very important that the front and the rear of the machine is kept free 
and  clean  of  obstructions.    Air  is  drawn  from  the  front  of  the  machine 
through  a  removable  filter  and  exhausted  through  the  rear  of  the 
machine.    With  the  refrigeration  switch  is  in  the  "On"  position  and  the 
level  indicates  “F”, the refrigeration compressor and the  condenser fan 
will begin to run within 2 minutes.  It is very important that the front and 
the  rear  of  the  machine  is  kept  free  and  clean  of  obstructions.    Air  is 
drawn  from  the  front  of  the  machine  through  a  removable  filter  and 
exhausted through the rear of the machine.   
 
NOTE 
THE MACHINE WILL LOAD A TOTAL OF APPROXIMATELY 1 ½ Liters OR ABOUT 
53 OUNCES OF JÄGERMEISTER.