Lochinvar KBN-SUB-09 产品宣传页

下载
页码 2
KNIGHT
®
FLOOR STANDING AND WALL MOUNT HEATING BOILERS
KNIGHT
HEATING BOILER
Submittal Sheet
KBN-Sub-09
JOB NAME ______________________________________________________________________
LOCATION ______________________________________________________________________
ARCH./ENGR.____________________________________________________________________
WHOLESALER __________________________________________________________________
MECH. CONTRACTOR ___________________________________________________________
MODEL NO. _____________________________________________________________________
TYPE GAS  ______________________________________________________________________
Btu/hr INPUT_____________________________________________________________________
Btu/hr OUTPUT___________________________________________________________________
NOTES
Standard Features
>Energy Star
®
Qualified
> Up to 96% DOE AFUE Efficiency
> Modulating Burner with 5:1 Turndown
> Direct-Spark Ignition
> Low NOx Operation
> Field Convertible from Natural to LP Gas
> Vertical & Horizontal Direct-Vent 
> PVC, CPVC or SS Venting up to 100 Feet
> Factory Supplied Sidewall Vent Termination
> ASME Stainless Steel Heat Exchanger
> Automatic Reset High Limit
> Inlet & Outlet Temperature Sensors
> Boiler Circulating Pump
> 30 psi ASME Relief Valve
> Adjustable Leveling Legs (KB Models only)
> Wall Mount Bracket (WB Models only)
> Zero Clearances to Combustible Material
> 12 Year Limited Warranty  (See Warranty for Details)
SMART SYSTEM
TM
Features
> SMART SYSTEM Digital Operating Control
> 2 line, 16 Character Display
> Dual Level Password Security  
> Domestic Hot Water Prioritization    
> Built in Cascading Sequencer for up to 8 Boilers
> 0-10 VDC Input Control
> Outdoor Reset Control with Outdoor Air Sensor
> Low Water Flow Safety Control & Indication   
> Alarm on Any Failure Contacts
> Service Reminder
> Freeze Protection
> Night Setback
> Time Clock
> Three Pump Control (System, Boiler & DHWP)
> Data Logging
> Examples: Hours Running, Space Heating
> Programmable System Efficiency Optimizers
> Examples: Anti-cycling, Ramp Delay
Optional Equipment
Place an X in the box by all options that apply
Adjustable High Limit w/ Manual Reset
Flow Switch
Low Water Cutoff w/Manual Reset & Test
Alarm Bell
Concentric Vent Kit
Condensate Neutralization Kit
SMART SYSTEM PC Software
Multi-Stack Frame
Firing Codes
M9 Standard Construction
M7 California Code