Intermec 751G 用户手册

下载
页码 156
Chapter 4 —  Maintaining the Computer
751G Color Mobile Computer User’s Manual
105
button, or you may damage the Reset button.
This shows the back of the 751G inside the battery compartment.
5
Return the 751G to DC power, such as installing it into a dock 
connected to external power.
6
When the Bootloader Menu shows “complete,“ remove the storage card, 
then press the Reset button again to load the new operating system.
7
When the 751G finishes booting, insert the battery, then close the 
battery door.
You may use the 751G. You have reset the 751G to its default 
configuration. You need to set the date and time and to set its network 
communications parameters to reestablish communications with the other 
devices in the wireless network.
Using the SmartSystems Console to Upgrade the Computer
You can use the SmartSystems Console to upgrade the operating system on 
your 751G. The console is part of SmartSystems Foundation and is 
available from the Intermec web site via the Intermec Developer Library 
(IDL). Before you can upgrade your computer, you need:
• the SmartSystems Foundation. To download SmartSystems Foundation, 
 and open the Device Management page.
• the device upgrade .exe file. This file is available from the Intermec web 
. Go to Service & Support > Downloads
Make sure the file you select is for your language.
1
Install SmartSystems Foundation on your PC and open the 
SmartSystems Console.
2
Ensure the SmartSystems Console and 751Gs are on the same subnet.
3
Make sure your 751Gs are either in a communications dock or charging 
dock, such as the AD14, or that power management is disabled.
4
Download the device upgrade .exe file to your desktop PC.
Note: The upgrade will fail if the 751G is not connected to external power. 
For help, see 
.
Reset button