Site requirements  12 
Utilities 
Consider the proximity to required utilities, such as power, water, and network connections. While the 
required utilities can be brought to nearly any selected site, there is the potential for increased costs and 
decreased efficiency when the HP POD 240e NA is located farther from the utility sources. 
For utility clearance information, see "Dimensions and required clearances (on page 
)." 
 
System utilities 
The site location must accommodate the following utilities: 
 
Water supply (on page 
) 
 
Drain locations (on page 
 
Power (on page 
) 
 
Water supply 
An external source of water must be provided for saturating the evaporative media. When the HP POD 240e 
NA begins operation, the supplied water is used in conjunction with the evaporative media to provide the 
specified cooling. 
The supply water must meet the following requirements. 
 
Requirement 
Specification 
Pressure 
20-70 psi (138-483 kPa) 
Temperature 
Between 1 °C and 30 °C 
Instant flow-rate 
No lower than the rated flow of the 
fill solenoid valve (1.5 gpm 
maximum flow per Adiabatic unit, 
maximum instantaneous). 
Connection 
¾” 
Hardness 
No greater than 40°fH (equal to 
400 ppm of CaCO3) 
Conductivity 
100 to 1250 μS/cm 
Organic compounds 
None 
Type of water 
Demineralized is preferred. 
Drinking potable water is 
acceptable and most likely. 
 
  
 
IMPORTANT:
  To connect the cooling system, a 0.0127 meter (½ inch) OD copper adapter is 
needed for water piping. 
  
  
 
IMPORTANT:
  If your water is out of range of these requirements, consult a water quality expert. 
  
In addition to the previous requirements, follow these guidelines: 
 
Do not treat the water with softeners. Softeners might produce foam, which affects the operation of the 
unit.